The Well Church has rapidly grown from humble roots into a thriving congregation with a mission to create spaces that foster connection, worship, and growth. The expansion from their current location marks a significant milestone, embodying their vision of “glory to glory,” where every stage of their progression brings them closer to their mission.
The ambitious project will convert this vacant movie theater into a multifaceted facility, housing everything a modern church could dream of. Six classrooms will provide space for educational programs, a dedicated area for primary-aged children catering to the next generation, and a coffee shop will serve as a hub for gathering and fellowship, before and after services.
At the heart of this transformation lies the construction of the auditorium. To create the expansive open floor plan required for the 1,200+ seat chapel, Engage will oversee the installation of three massive 86-foot steel mega girders. These girders will support the ceiling, allowing the removal of existing interior walls that once separated the theater’s screening rooms. The technical scope of the project includes a state-of-the-art acoustic, audio, and visual booth that will ensure that every event at The Well Church will be enhanced by high-quality sound and visuals, creating an immersive experience for attendees. As the project progresses, Engage Contracting is proud to contribute to the vision of The Well Church, creating a space that will stand as a beacon of faith, unity, and modern architectural ingenuity in the heart of Sandy, Utah.
留言